Final Rtg. = Final Rating
The final assessment rating of the soil rating area. On this profile we have only one arable soil rating area. The productivity rating is 55.35 points and the economic factor ratings total10 points. The final rating is 45.35 points.

 

Calculation Sequence:
PR - Econ. Factors = Final Rtg.

55.35 – 10 = 45.35

| Close Window |